top of page
Blog
Search


Changeovers: Speed and Quality can be Allies
The Results
The changeover time is reduced from 2-3 hours to 18 minutes. The internal scrap is reduced from 9 bad parts to 4 bad parts per


Doing the obvious is often wrong
Bottlenecks were eliminated and a dysfunctional department was transformed into a team in both performance and morale.


Finding and removing the ‘obvious’
total output of the plant increased 33% as measured over the ensuing two months.
bottom of page